Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9294514
| No.9294514
- Product Categories
- Friendly Links
| Information Name: | The reaction kettle inverter maintenance |
| Published: | 2013-03-26 |
| Validity: | 365 |
| Specifications: | According to the manufacturer standard |
| Quantity: | 92.00 |
| Price Description: | |
| Detailed Product Description: | When the package of equipment can not operate when the converter maintenance inspection of the reactor can not be ignored. Yung economic electromechanical technicians in addition to quickly resolve problems on the factory floor, the Remote Assistance Similarly, their strengths. The common reactor inverter repair failure: 1, machine hiccup: that is faster or slower when the fan, no display. General control panel short circuit, remove the control panel and then power-on, such as hiccups may be thick-film device around bad. 2, the fan weakness, slow speed: the drive circuit breakdown. On telegraph 8888: FECDF21U1 board U8 bad, there is a small crack. With load shutdown at 8888: inverter inductance quantitative difference or the PC9 former Vice edge of insulation is not enough. Run newspaper in 8888: drive optocoupler short circuit. 4, the high-power inverter: the original fault bombing run no output or E019 repair the often bad U9. No output Q2 is also sometimes bad. Small power inverter: the original fault bombing, repair power no output, often bad R13. Repair bombing is to make a habit of measuring R13 whether 10 European, or other parameters. Reactor generic type of inverter converter repair applications, it does not apply only with certain equipment, paper, textile, printing machinery, steel strip, film, painting equipment, etc. It is also widely used in large speed range, accuracy high, tension control process control field; elevators, cranes, promotion, parking equipment, or three-dimensional garage need high-speed operation, high starting torque and position control, the promotion of the control field; construction machinery, wire drawing machine, extruder transmission equipment requires high-speed operation, a high starting torque and position control the field of machine control. The common reactor converter repair work on top of several knowledge and experience is gained or require long-term practice. Yung economic technicians can also be consulted for more resources. |
Admin>>>
You are the 30710 visitor
Copyright © GuangDong ICP No. 10089450, The Guangdong economic electromechanical Yung technology companies All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 30710 visitor
Copyright © GuangDong ICP No. 10089450, The Guangdong economic electromechanical Yung technology companies All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

